Bullard, TX

Industry Insights

Technical guidance on EHS compliance, oilfield engineering, and Texas regulatory requirements, written by practitioners, not marketers.

Regulatory

400,000 RRC Violations Analyzed: What Texas Oil & Gas Operators Actually Get Cited For

We analyzed 401,471 RRC violations from 2015 to 2026. More than a quarter were for signs. Here is what Texas oil and gas operators actually get cited for.

Read Article →
Regulatory

What Does an SPCC Plan Cost? A Pricing Guide for Texas Operators

What an SPCC plan costs and what drives the price: self-certified vs. PE-certified plans, facility size, and typical industry ranges for Texas operators.

Read Article →
Regulatory

NSPS OOOOb and OOOOc in 2026: What the Deadline Extensions Mean for Texas Operators

Where EPA's NSPS OOOOb and OOOOc methane rules stand in 2026 for Texas operators: which deadlines were extended to January 2027, and what still applies.

Read Article →
Regulatory

Produced Water Disposal and Compliance in Texas: An Operator's Guide

How produced water is regulated in Texas: RRC disposal well rules, the RCRA E&P exemption, spill reporting, induced seismicity, and recycling.

Read Article →
Project Management

The Anatomy of an Audit-Proof P&ID: From Field Verification to Digital Twin

Audit-proof P&IDs for Texas oil & gas: a 4-stage method for field verification, SPCC & LDAR documentation, RRC/PSM compliance, and digital twins.

Read Article →
Operations

API 510/570 Compliance Deep Dive: Leveraging Predictive Maintenance for Pressure Vessel and Piping Integrity

A technical guide to API 510/570 compliance for pressure vessels and piping, detailing how to leverage predictive maintenance and RBI to ensure integrity.

Read Article →
Regulatory

How to Build a Centralized Environmental Compliance Calendar

A definitive technical guide for energy operators on building a centralized environmental compliance calendar to manage EPA, RRC, and OSHA regulations in Texas.

Read Article →
Regulatory

How to Build and Implement a Compliant LDAR Program from Scratch

How to build a compliant LDAR program from scratch: component inventory, mapping NSPS Quad O rules, choosing Method 21 or OGI, and repair timelines.

Read Article →
Regulatory

How to Characterize Oilfield Waste in Texas: Waste Profiles, Testing, and the 2025 RRC Rules

How Texas operators characterize oil and gas waste under the RRC's 2025 rules: Waste Profile Forms, process knowledge vs. testing, manifests, and records.

Read Article →
Regulatory

Checklist: Is Your Oil & Gas Operation Ready for an EPA or RRC Audit?

A self-assessment checklist to get your Texas oil and gas operation audit-ready for an EPA or RRC inspection: permits, air, waste, spills, and records.

Read Article →
Regulatory

Clean Air Act (CAA) Essentials for Upstream & Midstream Operations

A technical guide to Clean Air Act (CAA) compliance for Texas upstream and midstream oil & gas operations, covering NSPS, NESHAP, LDAR, and state permitting.

Read Article →
Regulatory

The Anatomy of an EPA Fine: How Penalties are Calculated and How to Avoid Them

A technical breakdown of how the EPA calculates fines under the Clean Air Act and a strategic guide for oil and gas operators to avoid them through consolidated

Read Article →
Regulatory

Clean Water Act (CWA) Compliance: What Every O&G Site Manager Needs to Know

A definitive guide for O&G Site Managers on Clean Water Act (CWA) compliance in Texas, focusing on SPCC, NPDES, and Section 404 to ensure operational continuity

Read Article →
Regulatory

The Definitive Guide to Oil & Gas Environmental Compliance in Texas

A guide to Texas oil and gas environmental compliance: which agencies regulate you (RRC, TCEQ, EPA, OSHA) and how to comply on air, spills, waste, and water.

Read Article →
Regulatory

SPCC Self-Audit: Catch Violations Before the EPA Does

A 3-phase SPCC self-audit protocol to catch violations before an unannounced EPA or RRC inspection, built for Texas operators under 40 CFR Part 112.

Read Article →
Regulatory

Decoding the Texas RRC: Key Statewide Rules Beyond the Drilling Permit

What the Texas Railroad Commission regulates and the key Statewide Rules for oil and gas operators: spacing, casing, flaring, disposal, and spill reporting.

Read Article →
Regulatory

Your First 24 Hours: A Step-by-Step Oil Spill Response Action Plan

A step-by-step oil spill response plan for the first 24 hours: secure, assess, notify, and contain, with the RRC, EPA, and TCEQ reporting triggers that apply.

Read Article →
Regulatory

How to Maintain Compliance Records for Audits and Inspections

A technical guide for energy operators on maintaining indisputable compliance records for EPA, RRC, and OSHA audits to achieve regulatory immunity in the Texas

Read Article →
Project Management

Mastering MOC: A Disciplined Approach to Management of Change that Prevents Future Failures

A technical resource for energy professionals on mastering Management of Change (MOC) to prevent failures, using the Texas UIC Class VI primacy transfer as a ca

Read Article →
Regulatory

Navigating RRC Rule 37: Well Spacing and Density Explained

A technical guide for Texas oil & gas operators on navigating RRC Rule 37 for well spacing, density, and exceptions to achieve regulatory immunity.

Read Article →
Regulatory

Negotiating with Regulators: Strategies for Favorable Outcomes

A technical resource for Texas Basin operators on strategies for negotiating with regulators like the RRC and EPA to achieve favorable compliance outcomes.

Read Article →
Regulatory

From NOR to Resolution: A Guide to Managing Site Remediation Projects

A technical guide for energy operators on managing site remediation from a Notice of Responsibility (NOR) to final resolution using consolidated oversight.

Read Article →
Regulatory

The RCRA E&P Exemption: An Operator's Guide to Oilfield Waste

How the RCRA exploration and production (E&P) exemption works: which oilfield wastes are exempt, which are not, and how operators lose the exemption.

Read Article →
Regulatory

Optical Gas Imaging (OGI) vs. Method 21: Choosing the Right LDAR Technology

OGI vs. EPA Method 21 for LDAR: how the two leak-detection methods compare on compliance, coverage, safety, and cost under NSPS Quad O for Texas operators.

Read Article →
Regulatory

Permitting for New Pipelines: Navigating the Environmental Hurdles

A technical guide for Texas pipeline operators on navigating RRC, EPA, and OSHA permitting, focusing on Class VI primacy and achieving regulatory immunity.

Read Article →
Regulatory

Post-Spill Soil and Water Sampling: A Scientific Protocol

A post-spill soil and water sampling protocol for Texas operators: containment, a sampling plan, lab analysis, and the 1% TPH standard for RRC closure.

Read Article →
Regulatory

How to Prepare for a Surprise RRC or EPA Site Inspection

How Texas operators prepare for a surprise RRC or EPA site inspection: document readiness, physical site checks, and how to manage the inspection itself.

Read Article →
Regulatory

How to Manifest Oilfield Waste Shipments in Texas: RRC Manifests vs. Hazardous Waste Manifests

Which manifest your oilfield waste needs in Texas: the RRC's oil and gas waste manifest under the 2025 rules, or a hazardous waste manifest under Rule 98.

Read Article →
Regulatory

Reporting a Spill to the RRC and EPA: Deadlines and Procedures

How to report an oil or produced-water spill to the RRC, the EPA via the NRC, and TCEQ: the triggers, the timing, and the forms Texas operators must file.

Read Article →
Regulatory

Secondary Containment Requirements for Oilfield Tanks and Equipment

Secondary containment requirements for oilfield tanks: how to size it (the 110% rule and 25-year storm freeboard), qualifying materials, and Texas RRC rules.

Read Article →
Regulatory

The 5 Stages of a Greenfield Environmental Impact Assessment

A 5-stage technical framework for executing a Greenfield Environmental Impact Assessment in the Texas Basin to achieve regulatory immunity and ensure operationa

Read Article →
Regulatory

Air Permitting a New Oil and Gas Well Site in Texas: PBR 106.352, Standard Permits, and NSPS

How to air-permit a new Texas well site: PBR 106.352 limits outside the Barnett Shale, when you need a standard or NSR permit, and the federal NSPS overlay.

Read Article →
Safety

More Than a Red Button: How 'Stop Work Authority' is a Technician's Most Powerful Engineering Tool

A technical resource on how Stop Work Authority (SWA) functions as a critical engineering tool for risk mitigation and regulatory compliance in the energy secto

Read Article →
Regulatory

Stormwater Permitting for O&G Construction Sites: A Quick Guide

A technical guide for Texas oil & gas operators on navigating TCEQ stormwater permitting (TXR150000) to ensure compliance and operational continuity.

Read Article →
Regulatory

In-House vs. Outsourced Environmental Compliance: A Guide for Texas Operators

In-house vs. outsourced environmental compliance for Texas oil and gas operators: real costs, pros and cons, and how to decide which model fits your operation.

Read Article →
Regulatory

Tier I vs. Tier II: Which SPCC Plan Does Your Facility Need?

How to determine your SPCC plan tier under 40 CFR Part 112: Tier I vs. Tier II vs. non-qualified, by storage capacity, container size, and spill history.

Read Article →
Regulatory

The Most Common RRC Violations for Permian Basin Operators (What the Data Shows)

The five RRC violations Permian operators are cited for most, from 100,000+ violations in RRC records (2015-2026), and how to avoid each one.

Read Article →
Regulatory

Understanding Emission Inventory Reporting Requirements

A definitive technical resource for Texas Basin operators on Emission Inventory reporting to the EPA, TCEQ, and RRC, focusing on regulatory immunity and scienti

Read Article →
Regulatory

Understanding the EPA's Role in Oil & Gas: A Primer for Operators

A primer for Texas operators on how the EPA and RRC divide authority over air, water, and waste, and where their overlap creates compliance risk.

Read Article →
Regulatory

NSPS OOOO / OOOOa / OOOOb / OOOOc (Quad O) Requirements: A Compliance Checklist

EPA NSPS Quad O (OOOO, OOOOa, OOOOb, OOOOc) for Texas operators: which subpart applies, LDAR, storage vessels, pneumatics, and the 2024 methane rules.

Read Article →
Regulatory

What Is a Notice of Violation (NOV)? And What to Do Next

What a Notice of Violation (NOV) is, who issues them, the most common triggers, and how to respond, from acknowledgment to a corrective action plan.

Read Article →
Regulatory

What Is an SPCC Plan? Requirements, Thresholds, and PE Certification

What an SPCC plan is, which facilities need one (the 1,320-gallon threshold), when a PE must certify it, what it must contain, and how often to update it.

Read Article →